Back to top

2007 Aegean Yacht Schooner

Bodrum, Turkey

$12,000,000

YAZZ, a stunning vessel launched by Aegean Yacht in 2007, seamlessly combines classic elegance with modern amenities. Its spacious social areas, wide range of water toys, attentive crew, and resident DJ create the perfect atmosphere for entertainment. Blending vintage style with contemporary systems and facilities, YAZZ guarantees maximum guest enjoyment.

 

With over 110m2 of deck space on the sundeck alone and a beam of 10m, YAZZ offers guests ample room for dining, sunbathing, socializing, and enjoying the yacht to their heart's content. The outdoor bar, large dining area, sun lounges, and onboard DJ provide a vibrant ambiance as guests bask in the sun. For a more intimate experience, the fully shaded main deck aft dining area beckons with its additional bar, spacious 12-seater dining table, and comfortable loungers. Canvas screens can also be utilized to ensure privacy and protection from the elements whenever desired.

 

Upon entering the main salon, you are greeted by a symphony of vibrant colors, tasteful furnishings, and captivating artwork. Despite its grand size, the salon maintains a warm and inviting atmosphere, inviting guests to relax and unwind. Moving below to the lower deck, you will discover five luxurious guest staterooms. Two master staterooms, one forward and one aft, boast impressive full-beam layouts and private staircases. Additionally, two double staterooms and one twin stateroom situated midships provide all guests with exceptional comfort. Each stateroom is equipped with smart TVs and lavish ensuite facilities.

 

YAZZ also comes equipped with two Pirelli chase boats, including a 42ft 900hp vessel and a 30ft 600hp one, ensuring comfortable transportation to and from shore. A large RIB tender is available for towing water skis and inflatables for those seeking high-energy adventures. For further excitement, guests can indulge in two Sea bobs and a Sea doo jet ski. For a serene experience, paddleboarding, utilizing the sea bicycle, or practicing yoga on the sundeck are perfect options.

 

Key Features

  • A timeless yacht built to a classical design, with modern amenities and huge guest spaces, ideal for entertaining
  • 2 x Pirelli 42 & 32 chase boats included
  • Vast 110m2 sundeck with bar, dining table and sun loungers
  • Foredeck jacuzzi
  • Extensive toy selection including a Sea doo jet ski and 2 x Sea bobs
  • Large, shaded living space on the main deck aft for protected dining and lounging
  • Inflatable swim platform from which to access toys, including a jellyfish netted pool

Disclaimer

Approved Boats is pleased to assist you in the purchase of this vessel. This boat is centrally listed by Worth Avenue Yachts.

Basic Boat Info

Tax Status: Not Paid
Boat Name: YAZZ
Make: Aegean Yacht
Model: Schooner
Year: 2007
Condition: Used
Category: Sail
Builder: Aegean Yacht
Construction: Steel
Boat Hull ID: YAZ012456318
Has Hull ID: Yes

Dimensions

Length: 183'8 ft / 55.98 m
Length Overall: 183'8 ft / 55.98 m
Beam: 32'10 ft / 10.01 m
Max Draft: 11'10 ft / 3.61 m
Cabins Count: 5

Engines / Speed

Engines: 2
Engine #1 Specs:
  • Make: MAN
  • Fuel: Diesel
  • Engine Power: 750hp
  • Type: Inboard
Engine #2 Specs:
  • Make: MAN
  • Fuel: Diesel
  • Engine Power: 750hp
  • Type: Inboard
Total Engine Power: 1,500hp
Cruising Speed: 11 kn
Maximum Speed: 13 kn

Tanks

Fuel Tanks: 1
Fuel Tank Capacity: 12,000 L
Water Tanks: 1
Water Tank Capacity: 15,997 L

Other

Heads Count: 7
Boat Class: Schooner

Main Machinery
  • Twin MAN diesel engines 750 HP
  • Engine hours: Port 2280; Starboard 2260 (Dec 2023)
  • Generators: 2 x Kohler generator 55 KW
  • Emergency generator: 1 x Kohler generator 27 KW
  • Generator hours: Port 8787; Starboard 8267 (Dec 2023)
  • 2 x Zerosalt watermaker 250 LT/Hour
  • 1 x Zerosalt watermaker 500 LT/Hour
  • 2 x Siemens water heater 60 LT
  • 4 x Chiller air conditioning compressor 170,000 BTU
  • Alfoleval fuel separator 300 LT/Hour
  • 2 x Refrigerator cooling pump 220 V
  • Watersaund Hydrophore 220 V
  • 2 x Leo air conditioning seawater cooling pump
  • 2 x Leo air conditioning circulation pump
Water and Fuel Systems
  • 3 x Penitax watermaker low pressure pump 220
  • Sanbuineti hydrophore pump 24 V
  • Fire pump 380 V
  • Bilge pump 380 V
  • Watersaund hydraulic seawater cooling pump 220V
  • Watersaund sewage pump 380 V
  • Gionsch sewage pump 24 V
  • 5 x Fuel day tank 500 LT
  • Main fuel tank 13,000 LT  
  • Clean water tank 16,700 LT  
  • Black water tank 6,200 LT  
  • Grey water tank 10,600 LT  
  • Black water tank 1,500 LT  
  • Grey water tank 2,000 LT  
Batteries
  • 24 x Stationary batteries
  • 2 x Victron Energy battery charger 24V 100A
  • 3 x Victron Energy inverter 5000VA 120A
  • 3 x Beijer Electronics tank level display
Galley and Laundry Equipment
  • 6 x Mini refrigerator
  • 2 x Electrolux ice maker
  • Electrolux industrial dishwasher
  • 3 x Liebberr Premium industrial refrigerator
  • Ugur upright refrigerator
  • 2 x Nespresso coffee machine
  • Siemens microwave oven
  • 2 x Gageneu grill
  • Gageneu oven
  • Siemens stove
  • Altus dishwasher
  • Maytag double door refrigerator
  • Miele dryer
  • 2 x Siemens washing machine
Communication and Navigation Equipment
  • Camera system
  • Magnetic compass
  • Steering indicator
  • Raymarine chartplotter
  • Furuno Navtex NX-300
  • NSR GNSS Navigator
  • TYCO T-1246-C fire control system
  • JRC-JSB 196GM radio telephone
  • JRC NCT 196N DSC/NBDP modem
  • Raymarine steering indicator
  • Raymarine depth sounder
  • Throne LAPS satellite phone
  • B-G chartplotter
  • Raymarine VHF radio
  • 12 x Televisions
Refit 2023
  • Main engine and generators were completely refitted
  • -18 +4 kitchen cabinets and sea water pumps were renewed
  • Air conditioning sea water pumps were renewed
  • Watermaker sea water pumps were renewed
  • Maintenance of watermakers was performed
  • Electrical panel was renewed
  • Some of the hydraulic circuits were renewed
  • A new tunnel was opened at the stern and a propeller was installed
  • Local putty on the boat side was renewed
  • The boat side and living quarters were completely painted
  • Fuse of the electrical panel in the engine room was renewed
  • 3 x TVs were purchased for the lounge
  • A TV unit + library + TV set was made for the lounge
  • Lounge seating group was renewed
  • Lounge was equipped with accessories
  • All cabin air conditioning fan systems were renewed
  • Air conditioning unit sea water circulation system was renewed
  • Satellite and internet system on the boat was renewed
  • Sound and music systems were updated
  • Kitchen equipment was renewed
  • BBQ equipment was added
  • Refrigerator in the kitchen was renewed
  • Kitchen floor was renewed
  • Staff cabins were completely renewed
  • Water installation, electrical and fire systems were overhauled
  • Maintenance of starboard and port sea entry stairs was performed
  • All sails were removed, washed, and hardware controls were performed
  • Deck sail lantern maintenance was performed
  • The steel part that joins the wood at the bar was completely primed, puttied, and painted
  • The bar at the stern was renewed
  • Shafts and propellers were removed and balanced
  • Anchors and their pockets were filled and polished
  • 1 x 500 gal watermaker was added
  • All chromes on the boat were polished
  • Deck caulking was partially renewed
  • 3 x Main masts local paint was performed
  • Lighting on the boat ceilings was renewed
  • -18 +4 kitchen refrigerator doors were renewed
  • 1 x New ice maker was added to the system
  • Maintenance of rudder pistons was performed
  • Bow propeller was removed and maintenance repair was performed
  • Windlass maintenance was performed
  • 50 meters each were added to the anchor chains for starboard and port
  • All sail ropes were subjected to a complete strength test, cleaned, and re-installed
  • Service and generator main engine batteries were checked
  • Boat door handles were completely renewed
  • Boat TV satellites were painted and their maintenance was performed
  • LED lighting was added to the boat
  • Gaps in the mast wires were taken
  • Chrome sheath was made to the mast wire tension lifts
  • Mast gaff deck lighting was renewed and upper lighting was renewed
  • Extractor stove fans in the kitchen were renewed
  • Chrome shelves were made to the kitchen
  • Fire systems were completely overhauled
  • Generator coil winding and electrical system maintenance was performed
  • Boat personnel handheld radios were completely renewed
  • Boat curtains were completely renewed
  • Engine room valves were renewed
  • Temperature and pressure system was made to the main engine start panel
  • Boat exterior scupper caulking was completely renewed
  • Corian countertops on the boat were sanded and overhauled
  • Staff bathroom and water installations were renewed
  • Tik grills were made to staff bathrooms and all cabins
  • Main engine and generators were completely painted
  • A complete new varnish was applied to the kitchen
  • Door glasses of the pool in the stern area were changed
  • Deck lighting LEDs were changed
  • Lifebuoys were changed
  • 2 x Projectors were mounted to the stern of the boat
  • Clothes dryer was renewed
  • A vertical refrigerator was purchased for the kitchen
  • A portable BBQ was purchased for the kitchen
  • Air curtain panel was purchased for the kitchen door
  • A dishwasher was purchased for the kitchen
  • Shelf system and floor chrome coating were made to the large cabinet interiors
  • Kitchen and bridge top ceilings were renewed
  • A DJ music set was purchased
  • A glass washing machine was purchased for the bar in the stern area
  • Internet system on the boat was renewed
  • Deck teaks were sanded
  • Bow propeller gears were renewed
  • Water pressure system was renewed
  • TV elevator was installed to the pool in the stern area
  • Complete maintenance was performed on 4 fire hydrant pumps
  • A sunbathing chapel was made to the flybridge
  • Railing varnishes were renewed
  • Stern master was renewed
  • A reciprocal opening and closing was made to the stern master scupper, one each for starboard and port
  • Maintenance was performed on the stern passerelle
  • Water and electricity system were moved to the flybridge
  • Maintenance was performed on the boat cabin system
  • The floor of the kitchen exit corridor captain cabin was renewed
  • A bar was made to the flybridge, cabinet and ice maker were added
  • 2 x Seating groups were added to the flybridge
  • Main engine non-flammable mats were renewed
  • Port water outlet chrome couplings were removed, polished, and mounted
  • The 3 booms of the sail mast were removed. Putty and paint were applied and they were reassembled
  • The port cover of the midship was removed, maintained, its teaks were changed and mounted
  • The teaks on the deck were partially replaced
  • 3 x PLC screens were calibrated and placed for manual tank indicators to be on the flybridge machine bilge floor
  • The midship starboard port shower system was renewed
Disclaimer

The Company offers the details of this vessel in good faith but cannot guarantee or warrant the accuracy of this information nor warrant the condition of the vessel. A buyer should instruct his agents, or his surveyors, to investigate such details as the buyer desires validated. This vessel is offered subject to prior sale, price change, or withdrawal without notice.

Contact Us