Back to top

2019 Lagoon Seventy 7

France

Request Price

LAGOON SEVENTY 7 - Year 2019

 

BOAT AVAILABLE FOR A SEA TRIAL IN SEPTEMBER 2019 IN MED & SAINT BARTHELEMY

 

Contact us for more details

Disclaimer

This listing is courtesy of the BoatWizard MLS and may be centrally listed with another broker. It is offered as a convenience by this broker/dealer to its clients and is not intended to convey representation of a particular vessel.

Basic Boat Info

Tax Status: Not Paid
Make: Lagoon
Model: Seventy 7
Year: 2019
Condition: New
Category: Sail
Construction: Fiberglass

Dimensions

Length: 77 ft / 23.47 m
Length Overall: 76'5 ft / 23.29 m
Waterline Length: 74'2 ft / 22.61 m
Beam: 6'3 ft / 1.91 m
Max Draft: 6'3 ft / 1.91 m
Dry Weight: 57,009.76 kg

Tanks

Fuel Tanks: 1
Fuel Tank Capacity: 2,801 L
Water Tanks: 1
Water Tank Capacity: 1,499 L

Other

Boat Class: Catamaran, Catamaran, Cruisers
More Info :

ADDITIONAL INFORMATIONS

LAGOON SEVENTY 7 - Year 2018

 

BOAT AVAILABLE FOR A SEA TRIAL IN SEPTEMBER 2018 IN MED & SAINT BARTHELEMY

 

PRESTINE UNIT, AVAILABLE IN 3, 4, 5 CABINS VERSIONS

Description fournie par le constructeur


The deck and the hull are assembled and equipment inside the boat has been installed. The time has arrived for the Seventy 7 to leave the production area where it has been for several months for mast stepping, the final phase for preparing Lagoon's newest ship before its launch.
The mast is positioned horizontally to position the spreaders, attach the rigging and cables, install the electrical systems and put the main sail in place.

Fitting the deck

Before mast stepping, the deck must be fitted, including installing the winches, cleats and blocks… all the equipment needed for the standing and running rigging.

Preparation

Next, the mast is prepared by positioning the spreaders and standing rigging, and attaching the running rigging. Afterwards, we install the electronics and electricity (radar, antennas and lighting) and prepare the hydraulic furlers. Then we prepare the boom (attach sheets and reefing lines) and install the main sail. We finish by placing the slings and verifying the shafts.

Mast Stepping

The actual mast stepping phase requires five people and is done on dry dock. It begins by slinging the mast which is strapped up and attached to the crane to be lifted in vertical position and placed above its position. Once in place over its shoe, it is connected to the stays, lower and intermediate shrouds and detached from the crane.

Premliminary Adjustments

To finish, the lower and intermediate shrouds are tightened and the initial adjustments are made. The final adjustments are performed after the launch. 

Characteristics of the rigging of the Seventy 7

The Seventy 7's rigging consists of:
- Aluminium mast with three spreaders. Height 32 metres
- Aluminium boom (optional carbon canoe boom)
- Standing rigging made of Kevlar
- Running rigging made of Dynema
- Genoa hydraulic furler

Disclaimer
La société offre les informations relatives à ce navire de bonne foi mais n'est pas en mesure de garantir l'exactitude de ces informations ni l'état du navire. Il revient à l'acheteur d'instruire ses agents ou ses experts afin de vérifier et de faire valider les informations de son choix. Ce navire est offert sous réserve d'une vente préalable

Contact Us